ECA experts speak at Installation Seminar
Key industry figures gathered in London for a major new electrical industry event focused on how to move the sector forwards in both skills and standards as we get ever closer to the UK government’s 2050 net zero carbon target.
Opening the event, Lord Don Foster welcomed ECA's Skills Charter. ECA Head of Technical Standards Gary Parker, and Senior Vice President Ruth Devine, joined a panel discussing the importance of electrical core competencies to safe installations.
The half-day event, run by Electrical Safety First and sponsored by AICO and CEF, covered growing the installer base, and discussed the challenges in finding sufficient numbers of suitable trainers.
Additionally, how funding for the apprenticeships and providing support for apprentices and their employers was explored, particularly for the 80% of small and medium sized organisations, who may lack the capacity to offer the variety of work needed within the apprenticeship.
Quickfire presentations gave the audience food for thought on the potential risks of poorly designed and installed LCT (low-carbon technologies) and further emphasised the work needed to be done in ensuring a safe and just transition to net zero.
The seminar was held at IET London, Savoy Place on 23 April with more than 100 delegates drawn from the electrical industry, manufacturers, wholesalers, education, government bodies, insurers, housing associations, and fire and rescue services.
Lesley Rudd, chief executive of Electrical Safety First, noted: “The increasing need for electricity means we have an increasing need for electricians, as does the move towards getting our homes and our electrical installations ready for net zero. Electrical Safety First fully supports the net zero transition, but it must be done safely.”
She closed the event by highlighting the importance of the electrical industry, saying: “This industry is crucial to our future and, working together, we can make that future a safe and successful one.”
ECA works closely with its Members, industry partners and Government to raise the profile of electrical contractor in the transition to Net Zero Carbon. We produce regular guidance notes, technical bulletins, and industry updates to keep Members at the forefront of the Net Zero transition.
This article appears on the ECA news and blog site as 'ECA experts speak at Installation Seminar' dated May 8 2024.
--ECA
[edit] Related articles on Designing Buildings
- Achieving net zero in social housing.
- Actuate UK issues climate warning and urges action.
- Aligning net zero with the levelling-up agenda.
- A zero-carbon UK by 2050?
- Carbon neutral.
- Climate Change Act.
- Construction skills crisis threatens UK net zero goals.
- ECA research cited in Welsh Government consultation on Net Zero Sector Skills
- England, Wales, electrical skills, training and net zero in 2023.
- Making Mission Possible: report on achieving a zero-carbon economy by 2030.
- Net zero building higher education and the skills of the future.
- Net zero by 2050.
- Net Zero not possible without right skills.
- Net zero strategy: build back greener.
- Skilled workforce unable to meet net zero ambitions.
- Skills shortage.
Featured articles and news
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.